House built in 1922 with less than 6 ft ceilings. Dug out 100,000 lbs of material and hauled it off in buckets. Took me about 3 months. Now we have 8ft ceilings. Foundation work handled by professional with proper permits.

** progress pics in the replies.

  • combomeal@lemmy.zipOP
    link
    fedilink
    arrow-up
    4
    ·
    7 days ago

    What a bonding experience lol. Very cool. That’s a lot work going from a crawl space to a basement.

    • altphoto@lemmy.today
      link
      fedilink
      arrow-up
      3
      ·
      7 days ago

      Don’t ask me how’s my back today. That was many years ago. Also I forgot the number of times I hit the top of the crawl space basement door hole… Because I hit it pretty hard.